Craiova International Airport is a major airport infrastructure project, covering approximately 165,000 m², initiated in 2024, with an estimated duration of 3 years. The project includes complex industrial construction works, the installation of steel structures and precast concrete elements, as well as the construction of industrial walls and roofs.

Photo gallery








Case study
Project description
In 2024, Avinci supported the implementation of the expansion and modernization of Craiova International Airport, a project classified under “Special Buildings” and carried out over a 3-year period. The works covered a total area of approximately 16,500 m², with interventions that required sustained technical coordination and site organization tailored to an asset with critical use.
The project was coordinated in partnership with Construcții Erbașu S.A and Primacons Group S.R.L, and Avinci’s role focused on project management activities and on the installation of the structural and associated closure components related to the execution stages. Through this approach, Avinci ensured continuity of the workflow between deliveries, installation at height, and preparation of the following stages.
From the perspective of the technological solution, Avinci contributed to the installation of industrial walls and roofs, as well as to the installation of steel structures and precast concrete elements, so that the structure and the building envelope were completed with controlled tolerances, aligned with the site’s execution pace. The attached images reflect the execution stages: the façade and the constructed volume, respectively the staged installation of the structure and roofing elements.
Project context
At Craiova Airport, the main objective was to expand and put into operation operational areas in line with operating requirements. For the client, it was necessary to build an industrial facility with a large overall size, a robust load-bearing structural frame, and a coherent building envelope (walls and roof closures), in order to achieve predictable load performance and an adequate service life for the intended use.
The requirement involved coordinating the interfaces between the structural works and the closure works, in parallel with organizing logistics for deliveries and installation. On such a site, planning activities had to reduce bottlenecks and maintain a constant pace between the prefabrication stages, site preparation, and installation at height, so that the works remained on the project schedule over a 3-year duration.
Works performed
- Industrial wall installation, including support preparation and fixing of closure subassemblies in correlation with the load-bearing structure.
- Industrial roof installation, including positioning of elements and alignment control over extended surfaces for geometric continuity.
- Steel structure installation, with staged joints and alignment/positioning checks before final fixing.
- Precast concrete elements installation, with controlled handling and lifting, alignment to project setouts, and preparation of joints with structural elements.
- Coordination of structure–envelope interfaces, so that closure operations were executed without delays and with reduced need for adjustments.
- Organization of installation activities at height, including planning execution windows and defining safety zones for interventions.
- Project management for coordinating execution stages related to the structure and envelope, with monitoring of the work pace over the 3 years.
Materials and systems used
| System / material | Details |
|---|---|
| Precast concrete elements | The execution included the installation of precast concrete elements in the load-bearing area, with controlled lifting and positioning on prepared supports. The joints were prepared to allow continuity of the structure in vertical and horizontal directions. |
| Industrial walls (closures) | The industrial wall system was installed in sequences, with preparation of fixings on the structure and checks to maintain flatness/alignment. The interface with the structure was treated to ensure consistent fixing across sections. |
| Industrial roof (volume closure) | Roof installation was carried out over extended surfaces, with supporting structure and aligned closure elements for continuity. The teams worked in stages to maintain the coherence of the assembly and the preparations for subsequent stages. |
| Structure–envelope interfaces (connection areas) | Avinci coordinated the connection areas between the load-bearing component and the closures, tracking compatibility of positions and the fixing method. Controlling these interfaces limited adjustments and supported the execution flow. |
| Steel structure (frames and load-bearing elements) | Avinci managed the installation and alignment of steel elements, with emphasis on joints and dimensional control during the fixing phase. The interventions were coordinated with deliveries and with the closure stages. |
Technical challenges
The technical challenge consisted in the integrated execution of the structure and closures for a large-scale building, where installation tolerances and alignments directly influenced the final quality. In the project images, the volume layout and continuity of the façade can be seen, and at roof level the installation over large surfaces can be followed, which required control of the positions of the elements, checks of verticality/flatness, and management of the joints.
From a logistics standpoint, the site required clearly defined flows for delivering structural steel elements and precast concrete elements, handling them under safe conditions, and allocating lifting equipment. Installation at height involved securing work areas, setting installation routes, and coordinating with adjacent works (preparing supports, installing subassemblies, preparing for sealing stages). Also, running the works over 3 years required maintaining a follow-up and scheduling update framework to avoid delays between subcontractors and between prefabricated lots.
Avinci solution
Avinci approached the project through a flow-oriented site organization: planning, preparation of installation points, dimensional control, and coordination between structural teams and closure teams. In the project management stage, the delivery schedules were aligned with the installation sequences, so that the steel structure and precast concrete elements could be introduced into execution without interruptions.
For the installation of industrial walls and roofs, Avinci coordinated the preparation of supports and the fixing of closure subassemblies in controlled phases. The interfaces between the structure and the building envelope were managed through repeated checks of positions and successive installation, to ensure geometric continuity and reduce the need for on-site corrections.
In parallel, the installation of steel structures and precast concrete elements was carried out with emphasis on rigor at joints and on alignment control. Lifting and installation procedures were aligned with the work sequences and the available equipment, and the teams were organized so that installation work at height took place within the planned execution windows, with checks performed before closure.
Final result
As a result of execution, Avinci contributed to delivering a coherent industrial building, with structure and envelope completed in stages, at a pace tracked throughout the 3-year period. The volume seen in the project images indicates the completion of façade areas and progress in roof installation, with elements positioned on supports and aligned subassemblies, which enabled the continuation of finishing works and subsequent integration.
For the client, the concrete value was achieved through reducing the risk of delays between the structure and the closures, by coordinating installation activities and by managing the sequences. In a project with an area of approximately 16,500 m², this approach supported continuity on site and reduced late corrective interventions. The outcome delivered by Avinci was reflected in the facility’s ability to move on to the following execution stages with correctly installed elements, prepared for sealing and integration.
Safety and quality
Avinci organized the site with a focus on work safety in active zones and at height, specific to a building involving installation on load-bearing elements and closures. Work areas were defined for handling parts, lift plans and access rules were established, and activities were carried out in coordination with the client’s site responsibilities and the involved constructors. Constantly, work on surfaces at height was managed through team organization and verification of work equipment before the start of the intervention.
Quality control was treated as part of the installation workflow: alignment and positioning checks on structural elements, joint zone control, and verification of preparations before final fixing of the closure subassemblies. For structure–wall–roof interfaces, Avinci maintained traceability through control points in stages, so that the steel components and precast concrete elements were integrated correctly and did not generate subsequent adjustments. In this way, execution quality was supported both dimensionally and through the rigor of work sequences.